+1 (713) 555-0100Emergency line · 24 / 7
HOUSTON · PASADENA
01 / SECTORS

Different regulators. Different failure modes.

A dairy packing hall and a sterile filling suite both need clean air, and almost nothing else about them is the same. We design to the inspection you will actually sit through.

Pharmaceutical manufacturing
02

Pharmaceutical manufacturing

Oral solid dosage, liquids, and sterile injectables. Dedicated air handlers per production zone, cascade that survives shift change, and a qualification pack written for the inspector rather than the file.

TYPICAL CLASS
ISO 5 – ISO 8
INSPECTED BY
FDA · cGMP
CRITICAL RISK
Cross-contamination
Hospitals & healthcare
03

Hospitals & healthcare

Modular operating theatres, intensive care, isolation rooms, and central sterile supply. Laminar ceilings over the table, redundant plant, and monitoring that alarms before a nurse notices.

TYPICAL CLASS
ISO 5 – ISO 7
INSPECTED BY
Joint Commission
CRITICAL RISK
Surgical site infection
Food & beverage processing
04

Food & beverage processing

Hygienic production halls, chilled packing rooms, and washdown-rated air handling for dairy, confectionery, and ready-meal plants where the line runs wet and the ceiling gets hosed.

TYPICAL CLASS
ISO 8 / hygienic
INSPECTED BY
FSMA · HACCP
CRITICAL RISK
Microbial spoilage
Biotech & diagnostics labs
05

Biotech & diagnostics labs

BSL-2 and BSL-3 containment, PCR suites, and tissue culture rooms. Here the cascade runs the other way — negative, sealed, and proven with a room integrity test before anyone works in it.

TYPICAL CLASS
BSL-2 / BSL-3
INSPECTED BY
Institutional biosafety
CRITICAL RISK
Containment breach
06 / ALSO SERVED

Smaller scopes, same method.

Cosmetics & personal care

ISO 8 filling and packing halls with humidity control for emulsions and powders.

Medical devices

Assembly and packaging cleanrooms qualified against ISO 13485 expectations.

Electronics & optics

ESD-safe low-particulate rooms with tight temperature stability.

Agro & veterinary

Feed premix, vaccine, and veterinary formulation suites with containment.

NEXT STEP

Send the brief.
Even the rough one.

An engineer reads it and replies within one working day — usually with the two or three questions that decide the price.