+1 (713) 555-0100Emergency line · 24 / 7
HOUSTON · PASADENA
01 / CONTROLLED ENVIRONMENTS

Air you can
put a number
on.

Cleanrooms, HVAC, and process utilities engineered as one system — and handed over with the measurements that prove it holds.

PROJECTS
180+
FIRST-PASS AUDITS
100%
ON PAYROLL
45
02 / PRESSURE CASCADE

Contamination moves with the pressure. So we decide where the pressure goes.

Select a zone to see the regime we design and then prove at qualification.

The outermost classified step. Positive against unclassified corridors so nothing drifts inward when a door opens, with enough air changes to clear particulate generated by movement and packaging.

AIR CHANGES
18 – 20 /h
FILTRATION
HEPA H13
TYPICAL USE
Warehousing, washing, granulation support
05 / AFTER HANDOVER

What clients say once the dossier is filed.

Collected from facility, QA, and procurement teams six months or more after we left site.

They asked harder questions at the design stage than our own QA did. By the time we reached OQ there was nothing left to argue about.

Mike Sullivan
Project Manager · Sterile injectables
NEXT STEP

Send the brief.
Even the rough one.

An engineer reads it and replies within one working day — usually with the two or three questions that decide the price.