+1 (713) 555-0100Emergency line · 24 / 7
HOUSTON · PASADENA
HOME / EQUIPMENT / DUCTING & AIR DISTRIBUTION
HVAC · EQUIPMENT

Ducting & air distribution

GI and pre-insulated ducting, volume control dampers, and low-turbulence terminal diffusers.

CATEGORY
HVAC
SPECIFICATION
Leakage class C
LEAD TIME
8 – 16 weeks typical
HANDOVER
With IQ/OQ/PQ dossier
Ducting & air distribution — installed view
Detail view
Detail view
Detail view
Detail view
02 / SPECIFICATION
CategoryHVAC
SpecificationLeakage class C
ComplianceFDA cGMP · EU Annex 1 · ISO 14644
03 / SCOPE OF SUPPLY
Site survey and a costed proposal against your user requirements
Detailed design, GA drawings, and design qualification package
Fabrication, factory testing, and delivery to site
Installation and commissioning by our own crews
Integration with adjoining HVAC, utility, and cleanroom scope
IQ/OQ/PQ execution, as-built drawings, and operator training
OPTIONAL

Environmental monitoring, controls integration, and annual requalification under a maintenance agreement.

NEXT STEP

Send the brief.
Even the rough one.

An engineer reads it and replies within one working day — usually with the two or three questions that decide the price.